Croydon High School

Client:

Girls Day School Trust

Description:

Construction of a new sports pavilion on a green field site, involving forming a 1Km temporary access road for all construction traffic through a wooded area alongside Selsdon golf club to meet the requirements and strict traffic management of the adjoining owners.

Main Contract Works:

  • Site clearance

  • Strip foundations

  • RC ground beam

  • Kingspan SIP’s panel system incorporating engineered joists to the flat roofs

  • External timber cladding to the external elevations with aluminium windows and doorsets

  • Internal acoustic ceilings and partitions

  • Shower and WC areas receiving Altro Whiterock sheet cladding

  • M&E installations serviced via new incoming water, gas, drainage and electrical supplies, approximately 700 l/M, within service trenches

  • New plant room consisting of a gas fired boiler, serving a LTHW heating system, plus a gas fired instantaneous water heater supplying the 15No. showers